The old existing wall had collapsed and was in a bad state of repair. The wall was completely rebuilt putting in a dogleg and pier using tudor facing bricks topped with blue engineering bricks for the wall and a concrete capping for the pier
The old existing wall had collapsed and was in a bad state of repair.
The wall was completely rebuilt putting in a dogleg and pier using tudor facing bricks topped with blue engineering bricks for the wall and a concrete capping for the pier